1. 2020
  2. The road to professionalization for Belgian general contractors: An analysis of La Chronique des Travaux Publics, du Commerce et de l’Industrie (1877-1914)

    Dobbels, J., May 2020, L'architecture et l'urbanisme du long XIXe siècle en Belgique. Lieux, protagonistes, rôles, enjeux et stratégies professionnelles. Prina, D. N. (ed.). Liège: Presses Universitaires de Liège, p. 31-45

    Research output: Chapter in Book/Report/Conference proceedingChapter

  3. Delineating construction competences and expertise. Analysis of twentieth-century dispute settlement by the Brussels’ contracting company Entreprises Générales Henri Ruttiens et Fils

    Dobbels, J., Apr 2020, Iron, Steel and Buildings: the Proceedings of the Seventh Conference of the Construction History Society. Campbell, J., Baker, N., Draper, K., Driver, M., Heaton, M., Pan, Y., Ruamsanitwong, N. & Yeomans, D. (eds.). Cambridge: Construction History Society, p. 599-610 12 p.

    Research output: Chapter in Book/Report/Conference proceedingChapter

  4. Iron and steel construction workshops in 19th and early 20th century Belgium: retrieving their oeuvre via trade catalogues

    Wouters, I. & Wibaut, R., Apr 2020, (Accepted/In press) Proceedings of the 12th international Conference on Structural Analysis of Historical Structures. 12 p.

    Research output: Chapter in Book/Report/Conference proceedingConference paper

  5. The private house of engineer Jean-Marie Huberty and its hypar roof. A unique experiment in concrete construction in Belgium in the 1960s

    Van de Voorde, S. & Raaffels, L., Apr 2020, Iron, Steel and Buildings: the Proceedings of the Seventh Conference of the Construction History Society. Campbell, J., Baker, N., Draper, K., Driver, M., Heaton, M., Pan, Y., Ruamsanitwong, N. & Yeomans, D. (eds.). Construction History Society, p. 679-692 14 p.

    Research output: Chapter in Book/Report/Conference proceedingConference paper

  6. Reliability-based analysis of a cable-net structure and membrane structure designed using partial factors.

    De Smedt, E. A., Mollaert, M., Van Craenenbroeck, M., Caspeele, R. & Pyl, L., 11 Mar 2020, In : Architectural Engineering and Design Management. 0, 0, p. 1-10 10 p.

    Research output: Contribution to journalArticle

  7. Aannemersarchieven onder de loep: Analyse van de bruikbaarheid voor de erfgoedsector

    Dobbels, J., Jan 2020, In : M&L - Monumenten, Landschappen en Archeologie. 2020, 1, p. 4-26 23 p., 1.

    Research output: Contribution to journalArticle

  8. A conceptual framework for interpretations of modularity in architectural projects

    Tavernier, I., Cambier, C., Galle, W. & De Temmerman, N., 2020, (Accepted/In press) A conceptual framework for interpretations of modularity in architectural projects. 10 p.

    Research output: Chapter in Book/Report/Conference proceedingConference paper

  9. Historique d’une entreprise de bâtiment bruxelloise. Archives des Entreprises générales Henri Ruttiens et fils (1878-2000)

    Dobbels, J. & Six, C., 2020, In : Bruxelles Patrimoines. 2000, 33, p. 176-185 10 p.

    Research output: Contribution to journalArticle

  10. Manipulating the snap-through behaviour of bistable scissor structures through computational design and optimisation

    Arnouts, L. I. W., Massart, T. J., De Temmerman, N. & Berke, P., 2020, (Accepted/In press).

    Research output: Unpublished contribution to conferenceUnpublished abstract

Previous 1 2 3 4 5 6 7 8 ...139 Next

ID: 20131